Preform Feeder System 6MTR. (300KG) At the Shendra Draw Tower plant, STL operates a draw tower made by Conductice. Initially, the feed system could only handle preforms that were 3 meters long Megha Engineering reconfigured the feed system to accommodate preforms that are six meters long. To achieve this The tower height was raised by 1.5 meters, necessitating additional structural support A completely new system was fabricated and installed on both sides. Special attention was paid to loading and unloading the extended preforms A new control panel was manufactured for overseeing this modification Design Installed